

We provide Vertical Shaft contractors, blast & remove the stone to the surface with a winder. If the shaft is to be this is normally placed as the shaft is excavated. our services Drill a pilot borehole from surface to existing underground workings, ream to a large diameter, then drill and blast and muck out through the borehole, the stone being removed from below using the mine's haulage system. our professionals well trained for the vertical shaft.





