Aiming at the problems that the continuity of construction and the interaction between various parts of the construction system were separated in the simulation calculation of the construction process in the past, we established an integrated collaborative time-varying analysis system and calculation theory for the construction process of complex steel structures. Through the integration of existing technologies such as life-death elements and new technologies such as state nonlinear solution technology, cable-pulley adaptive algorithm, jack-contact element, and point-by-point deconstrained form-finding method created by the research group, the permanent components in the construction process are integrated. The gradual installation, assembly and dismantling of temporary supports, the appearance and disappearance of construction temporary loads, the effects of temperature and wind loads, etc., can truly reflect the time-varying nature of structural installation, boundary conditions, load effects, and material properties;Especially good at accurately analyzing the evolution of the construction system in the time and space domain, accurately calculating the interaction between the various parts of the construction system, and accurately grasping the continuous change and nonlinear accumulation process of the internal force and configuration of the structure during the construction forming process.
The research team established a multi-stage comprehensive iterative method for the calculation of the three-dimensional dynamic deformation pre-adjustment value during the construction process for the structure with a particularly complex construction path and construction deformation development process, which effectively solved the deformation pre-adjustment of the main building of the new CCTV site and the new Guangdong Provincial Museum. value calculation problem.
By effectively integrating digital simulation computing technology into new construction technologies such as overall structural lifting, overall falling, overall sliding, overall tensioning, and overall lifting, we have established a digital and information system that accurately evaluates construction plans and structural safety during construction. Application Technology.
In the overall lifting construction technology, a safety guarantee mechanism for the lifting system has been formed, which prevents the potential damage risk of the lifting structure and tire frame caused by the different stress conditions between the design state and the lifting state; a reasonable distribution mechanism for the lifting force has been formed, which can automatically control the lifting The complex distribution relationship of the total weight between the structural column and the hoisting tire frame; a whole-process time-varying control mechanism has been formed, and the "seamless" digital simulation analysis of the hoisting links such as "detaching from the tire frame-lifting-closing-falling frame" of the lifting structure has been realized. Connection", which reveals the complex interaction mechanism between the lifting structure system and the supporting structure system, and can realize the asynchronous displacement of lifting points, collisions during lifting, broken cables and other special conditions and wind loads in an overall finite element analysis model Automatic analysis and evaluation of load conditions such as , temperature effect, etc.
In the overall sliding construction technology, the active control of the interaction force between the sliding structure and the sliding support system at different positions and different construction steps is accurately realized; The precise analysis of contact-detachment-re-contact and mutual displacement has solved the distortion problem that was previously analyzed by the support displacement method; in the overall tension construction technology of the tension structure, the initial prestressed state has been realized. The seamless connection of form-finding analysis, tension process analysis and action effect analysis during use makes up for the technical shortcomings of cable structures for large displacements and complex boundary conditions; in order to meet the needs of installation of giant steel arches and giant ring steel structures , we proposed a complete set of self-adaptive integral lifting construction scheme and integrated modeling collaborative time-varying analysis technology; proposed state nonlinear solution technology, dynamic configuration solution technology, point-by-point constraint finding Shape analysis method, new technology of pseudo pulley and movable cable pulley unit for structural hoisting, etc., established construction plan optimization technology based on time-varying analysis, effectively solved the nonlinear change and accumulation of internal force and configuration of time-varying structures during construction simulation analysis problems.