Steel structure manufacturers should do a good job of various preliminary operations. For example, before the lifting, the equipment personnel should respond to the component for re -testing. As long as the component is not deformed and the equipment specifications are accurate. Under the premise of recognizing that the intensity of the concrete reaches the root cause of the root, other equipment personnel also respond to the embedded bolts or cup mouths of the steel column root to check for inspection. If the orientation and elevation specification of the roots are found to be fault, it is necessary to record the part of the part to adjust the position of the steel column.

In order to march the equipment accuracy of all steel structures, there are some leading equipment with column support, tie and roof support in the factory building.

The high -strength bolt method is first twisted first. In the process of tightening, the axis of the steel column is dynamically stated. If the axis changes leap out the accommodation value, it should be adjusted immediately. All tightening processes should be from the beam pillar, to support, rod contact. The symmetrical method of the two ends of the same part can be used to reduce unilateral accumulation faults so that the steel column equipment can be accurate. Assuming that in this process, the device parts and device parts are not adjusted, but the device parts cannot be adjusted. Instead, adjust the device parts or use other compensation methods. For example: Steel beams and steel columns do not cooperate, they cannot adjust the steel column, and can only adjust the steel beam. In the process of all rowing equipment, the accuracy of steel column equipment for steel structure factories is a necessary condition for accurate equipment.

In the installation and construction process of the steel structure plant, some independent row racks should form a stable structure from quickly. After the above methods, you can separate other parts from the equipment in order so that all the factories have a stable and stable arranging structure.

All needs to be temporarily fixed with bolt holes in the on -site welding parts. The growth of the scheme should be convenient for equipment and adjustment, which is also more favorable for ensuring the accuracy of all equipment. The unilateral connection hole of the sub -components such as the bar strip should also grow the shape of the scheme. Of course, the related pads should also be increased accordingly.

There are many ways to install the construction of steel structure factories. As a manager, we should continue to summarize and accumulate experience. As a result, when the installation of steel structure factories in the future is continuously implemented, the accuracy of the equipment can not only be marked, and the amount of rework can be reduced, and the safety of the high -altitude operation can also be traveled.